User ManualTable of ContentsROUGH-IN DIMENSIONS2Installation Of Sidewall Vent System7FOREWORD2Vent Terminal Installation, Sidewall7Preparation Of Blower Assembly8Precautions3Installation Of Vent System, Sidewall10Chemical Vapor Corrosion3Installation Of Vertical Vent System10Improper Combustion3Vent Pipe Preparation10Liquid Petroleum Models3Gas Connections12Extended Non-Use periods4Connection of Gas Pipe12Insulation Blankets4Circulating Pump4To Operate Heater12Dishwashing Machine Requirements4Lighting & Operating Label13Purging14Required Ability4Temperature Regulation14General4Grounding4High Altitude Installation4Main Burner14Location Of Heater4High Temperature Cut-Off Switch15Air Requirements5Venting System15Unconfined Space5Power Venter Maintenance15Confined Space5T & P Valve15Water Connections5Draining15Water (Potable) Heating & Space Heating5Main Burner And Igniter15Closed Water System6Condensation16Relief Valve6Cathodic Protection - Anode16Venting6Service & Repair16Vent Pipe Termination6TROUBLE SHOOTING16Planning The Vent System7LIMITED WARRANTY20Size: 566 KBPages: 20Language: EnglishOpen manual