User ManualTable of ContentsBEFORE YOU BEGIN...................................................................................... 12IMPORTANT SAFETY NOTICE....................................................................… 22HARDWARE PACK…….......….....................................................................… 32ASSEMBLY INSTRUCTIONS........................................................................... 72PARTS LIST...................................................................................................... 292RESISTANCE CHART…………........................................................................ 312WARRANTY.................................................................................................…. 322ORDERING PARTS.......................................................................................… 322HARDWARE PACK4HARDWARE PACK5HARDWARE PACK6HARDWARE PACK7Place the Main Base Frame (#2) on a flat surface.8Attach two Pulleys (#84) to the open oblique pulley brackets on the center of the Main Base Frame. Secure each Pulley with one M10 x 2” Allen Bolt (#102), two Ø ¾” Washers (#118), and one M10 Aircraft Nut (#125).8Attach four Pulleys (#84) to the other four open brackets on the Main Base Frame. Secure each Pulley with one M10 x 1 ¾” Allen Bolt (#101), two Ø ¾” Washers (#118), and one M10 Aircraft Nut (#125).8DIAGRAM 18DIAGRAM 1219Slide a Ball Stopper (#70) onto the 161” Upper Cable (#52). Slide and Pull the Cable Strap Bracket (#45) onto the Cable. Secure the Bracket with a M8 x 1 ¼” Allen Bolt (#110) and M8 Aircraft Nut (#124).20Attach the tip of the Upper Cable to the Pulley on the front of the Upper Frame (#5). Insert the Cable into the Frame through the tube to the second opening. Remove the Pulley to get the Cable out then reinstall the Pulley.20Draw the Cable around the Pulley then down to the right Pulley on the back of the Bench Press Base (#32). Draw the Cable around the right Pulley then to the Pulley on the front of the Front Vertical Beam (#3).20Draw the Cable around the Pulley then back to the left Pulley on the back of the Bench Press Base (#32).20Draw the Cable around the left Pulley then to the Pulley in the upper open slot on the Front Vertical Beam (#3).20Draw the Cable underneath the Pulley then pull upward to the first right Pulley underneath the Upper Frame. Draw the Cable over the Pulley to the second right Pulley underneath the Upper Frame.20Draw the Cable over the Pulley then pull downward. Attach the Cable to the upper Pulley on an Angled Double Floating Pulley Bracket (#26) installed in Step12. Attach the Bracket underneath the Pulley Pre-tensioner (#24).20Draw the Cable underneath the Pulley then pull upward to the Pulley on the Adjustable Single Pulley Bracket installed in Step-7G. Let the Double Floating Pulley Bracket (#26) hanging for now.20Draw the Cable around the Pulley then pull downward to the Selector Rod (#36).20Attach the end of the Cable to a M12 x 1” Split Bolt (#42). Thread the Split Bolt through a Ø 1” Spring Washer (#116) and the ring on the Weight Plate Selector Pin (#72) into the Selector Rod (#36).20Connect the Lat Bar (#17) to the Cable Strap Bracket with a Hook (#41).20Place the Lat Bar onto the Lat Bar Holder.20DIAGRAM 1321Slide a Ball Stopper (#70) onto the 262” High-Low Cable (#53). Slide and Pull the Cable Strap Bracket (#45) onto the Cable. Secure the Bracket with a M8 x 1 ¼” Allen Bolt (#110) and M8 Aircraft Nut (#124).22DIAGRAM 1423PARTS LIST30KEY NO. DESCRIPTION Q’ty30Station32Bench Press32High Low Cable32Station32Size: 4.32 MBPages: 33Language: EnglishOpen manual