User ManualTable of ContentsTitle Page1Table of Contents6SAFETY CONSIDERATIONS12REGULATORY INFORMATION141. Regulatory Requirements142. FCC Part 15 Requirements ix143. FCC Part 68 Registration ix143.1 Company Notification143.2 Service Requirements153.3 Location of FCC Compliance Labels154. Direct-Inward Dialing (DID) Calls155. Regulatory Information on Single-Line Analog Telephones xi166. Hearing Aid Compatibility xi167. Industry Canada CS-03 xi168. Safety Certifications xii178.1 Safety Considerations17CHAPTER 1 INTRODUCTION181. Purpose182. Reference Manual183. How To Follow This Manual193.1 Scope Of Installation Procedures19CHAPTER 2 GENERAL INFORMATION201. TRUNKING DIAGRAM202. SYSTEM CONFIGURATIONS22CHAPTER 3 INSTALLATION PROCEDURES281. Precautions281.1 Grounding Requirements281.1.1 Equipment Ground281.1.2 Supplementary Ground281.2 Static Electricity Precautions291.3 Procedure for Unplugging/Plugging Circuit Cards312. Procedure33NAP 200-001 Unpacking351. Unpacking Procedure35NAP 200-002 Marking and Drilling371. Confirmation of the Equipment Layout372. Marking372.1 Floor Standing372.2 Wall Mounting383. Drilling39NAP 200-003 Installation of Main Equipment401. Floor Standing Installation402. Wall Mounting Installation633. 19-Inch Rack-Mounting Installation693.1. Single-PIM Installation693.2. Multiple-PIM Installation714. Desk Top Installation75NAP 200-004 Installation of Peripheral Equipment771. Installation of External MDF772. Installation of SN610 ATTCON783. Installation of SN716 DESKCON83NAP 200-005 Connection of Battery891. Battery Connection891.1. Internal Battery Connection911.2. Battery Connection in the BATTM94NAP 200-006 Cable Running to the MDF961. MDF Cable962. Cable Running to the External MDF983. Cable Running to the MDFM101NAP 200-007 Termination of Cables on the MDF1031. Cable Connection to the MDF1032. MDF Cross Connections114NAP 200-008 Mounting of Circuit Cards159NAP 200-009 Installation of Back up MP System1621. Mounting of MP Cards1622. Cable Connection between MP Cards1633. Starting Up the Back up MP System1654. Operation Test1675. MP Changeover Test167NAP 200-010 System Initialization and System Data Entry1681. System Initialization1681.1 All Clear, Except LEN0000 CAT1681.2 Resident System Program1684. System Data Entry1691.3 CAT1691.4 MAT170NAP 200-011 Operation Test171NAP 200-012 Cleaning and Visual Check1721. Cleaning1722. Visual Check172NAP 200-013 Mounting of the Front Cover173Size: 2.55 MBPages: 173Language: EnglishOpen manual