User ManualTable of ContentsChapter 1: Introduction71.1 First steps71.2 Service addresses71.3 About this manual8Chapter 2: Safety92.1 Safety symbols92.2 Information for the system operator92.3 Information for operating personnel10Rules for normal operation102.4 Intended use112.5 Residual risks and safety measures12Chapter 3: Technical data15Chapter 4: System description194.1 VIBCONNECT RF bridge194.2 VIBCONNECT RF sensor unit21Operating cycle: measuring, sending, idling22Topology of radio cell244.3 VIBCONNECT RF sensor25Chapter 5: Installation & commissioning265.1 Quick guide265.2 Configuration in OMNITREND275.2.1 Installing and registering device drivers275.2.2 Setting up measuring point database285.2.3 Creating and printing measuring point report295.3 Installation & commissioning of bridge305.3.1 Changing IP address of bridge305.3.2 Installation requirements325.3.3 Mounting bridge335.3.4 Connecting bridge345.3.5 Commissioning bridge345.3.6 Overview of connections and interfaces355.4 Installation & commissioning of sensor unit365.4.1 Overview of connections and interfaces375.4.2 Measuring reception field strength at location of installation385.4.3 Mounting sensor unit405.4.4 Connecting sensor unit415.4.5 Commissioning sensor unit425.5 Installation of sensors435.5.1 Choosing the measuring points435.5.2 Mounting sensor445.5.3 Installing and connecting sensor line to sensor unit495.6 Configuration in OMNITREND (continued)505.6.1 Registering bridge in OMNITREND505.6.2 Registering sensor units in OMNITREND51to a sensor unit and bridge525.6.4 Creating measuring configuration545.6.5 Loading measuring configurations to the bridge565.6.6 Importing measuring data in OMNITREND56after commissioning of the system57Chapter 6: Maintenance586.1 Cleaning586.2 Installation report586.3 Battery-powered sensor unit586.4 Warranty606.5 Spare parts and accessories60Chapter 7: Troubleshooting61Chapter 8: Decommissioning and disposal62Decommissioning62Disposal62Size: 1.3 MBPages: 68Language: EnglishOpen manual