Berkley B2ZRKL Manual De Usuario

Descargar
Página de 24
Page 4
F00633
Pump Foundation
Installation
Typical Installations
;;;;;
;;;;;
;;
;;
;;
;;
;;;;;;;;
;;;;;;;;
;;;;;;;;
;;;;;;;;
@@@@@@@@
@@@@@@@@
@@@@@@@@
@@@@@@@@








Drai
nage
Dra
inage
Pump or
 Motor Frame
1/2" or thicker
Sole Plate tapped
for hold down bolts
Anchor
Bolts
;;;;;;;;
;;;;;;;;
;;;;;;;;
;;;;;;;;
@@@@@@@@
@@@@@@@@
@@@@@@@@
@@@@@@@@








Pump or
 Motor Frame
Shims
for alignment
Anchor
Bolt
Steel
Channel
Concrete
Foundation
Grout
Dam
Drainage
Wedges
Various Heights
;;;;;;;
;;;;;;;
;;;;;;;
;;;;;;;
@@@@@@@
@@@@@@@
@@@@@@@
@@@@@@@








Concrete
Foundation
Shims
Pump and Motor
Base
1300 1094
Tack
Weld
Concrete Foundation
Grout
• There are several types of permanent pump/
foundation installations in use. Those pictured above
are typical.
• If grout is used, top of concrete should be left rough
to provide a good bonding surface.
• Foundation should slope away from pump to prevent
liquid from pooling.