Pfaff 1183 Manual De Usuario
Installation and commissioning
20
● Loosen nuts 1.
● Tighten the V-belt with belt take-up
hanger 2.
● Tighten nuts 1.
IA PFAFF motor is shown in
Fig. 8-02. If another motor is
used, carry out this step accor-
ding to the instructions in the
motor instruction manual.
Fig. 8 - 02
1
2
8
.01.02
Adjusting the V-belt tension
This step is eliminated for integrated sewing motors.
● Break out the belt guard case 1 at the
points marked by the arrows.
● Fasten belt guard 2 in holes 3.
● Attach belt guard 4 to the machine case
with screws 5.
Fig. 8 - 03
1
2
8
.01.03
Mounting the upper V-belt guard
This step is eliminated for integrated sewing motors.
3
3