Fujitsu C150-E049-02EN Manual De Usuario
M3099GX/GH OEM Manual
4-19
BASIC
OPERATION
OPERATION
Replace the belt as follows:
WARNING
Wait at least 3 minutes after turning off the power before
replacement.
Wait at least 3 minutes after turning off the power before
replacement.
3 Disconnect the two relay
connectors on the roller
ASY.
ASY.
4 Push the two levers (green)
towards each other to dis-
engage with the upper
locking holes and lower
down the two levers until
they engage with the two
levers locking holes.
engage with the upper
locking holes and lower
down the two levers until
they engage with the two
levers locking holes.
Guide
Guide plate
Hopper table
5 Lift the document sensor
unit and keep it at the
upper position with one
hand and pull the roller
ASY out with the other
hand.
upper position with one
hand and pull the roller
ASY out with the other
hand.
6 Move the guide on the
hopper table completely to
the end.
the end.
Belt Replacement
1 Turn off the power switch.
Make sure that the hopper
table is at the bottom.
table is at the bottom.
2 Open the upper transport
unit. (See page 4-2)
Upper transport unit
Operator panel
Power switch
Lever
Lever (green)
Roller ASY