DMP Electronics SCS-1R Manual De Usuario

Descargar
Página de 31
Digital Monitoring Products 
SCS-1R Installation Guide
4
IntRoduCtIon
Installation Checklist
Refer to the Hardware Description section of this guide for installation, setup, and operating information.
SCS-1R Faceplate
To lower the SCS-1R faceplate, turn the two screws located in the top corners of the SCS-1R.  The front of the 
SCS-1R opens on a hinge to allow access to the inside of the SCS-1R.  Close the SCS-1R system by raising the front 
of the SCS-1R and securing the two screws in the top corners.
Earth Ground
Connect the ground lug on the modem rack rear side to earth ground.  Using a minimum of 14 gauge wire, ground 
to a cold water pipe, building ground, or a ground rod.  Do not ground to electrical conduit or telephone company 
ground.
Location of Circuit Boards
Confirm the circuit boards in the modem rack and in the multibus rack are installed properly and are in their 
proper locations.  The circuit boards are properly installed when completely seated into the connector on the 
rack backplane.  
SCS-208 Power Cord
Connect the SCS-208 Power Cord from the SCS-120 Multibus Power Supply card to the SCS-130 Transformer Card.
Phone Lines
Connect the RJ11X cables provided with each line card to the phone lines used for receiving alarms.   
Network Connection
When using a network interface card, connect the SCS-101 network cable to the data network.  Refer to the 
Hardware Description and Appendix for SCS-101 network installation instructions.
AC Power
AC power input of the receiver is 120 VAC, 60Hz and at least 3.5 Amps outlet not controlled by a switch .  Do 
not apply AC power yet.  For listed operation, use a listed uninterrupted power supply (UPS).  The UPS system 
must have a secondary power source (batteries) and provide alarm contacts to indicate when the UPS switches 
from primary power to secondary power.  The SCS-1R Receiver requires a UPS that delivers at least 400 VA power 
operating at 60Hz.
Optional Printer
Connect the RS-232 printer cable.  Install paper, connect the printer to AC power, and turn on the printer power 
switch.
Note: UL central station applications must use a serial printer that is listed for Fire Protective Signaling 
Systems.
Start up
Apply 120 VAC to the AC power cord.  The 120 volts supplied to the SCS-1R Receiver and the printer must be from 
the same UPS circuit.
Configuration
After powering up the system, set the correct time, configure the phone lines and network communications.
Note: Be sure that the Membrane Keypad is set to Address 01 (one). Refer to LCD Membrane Keypad Configuration 
for complete information.