Avaya 03-300430 Manual De Usuario

Descargar
Página de 2574
Communication Manager Maintenance-Object Repair Procedures
1468 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
Figure 82: ISDN-PRI Outgoing Test Call 
Synchronous Test Calls
Use one of the following commands to initiate a synchronous outgoing test:
test trunk grp#/mem# long [repeat #]
test board address long [repeat #]
test port address long [repeat #]
The previous test sequences include a test call for ISDN-PRI trunks. The duration of the test call 
is 8.6 seconds for unrestricted (B8ZS) B channels and 9.4 seconds for restricted (ZCS) B 
channels. The test fails if the bit error rate retrieved from the Maintenance/Test digital port is 
greater than 0. When this occurs, you will need to perform further diagnostics, such as test 
isdn-testcall
 described below.
Asynchronous Test Calls
You can start, query, and stop an outgoing test call by using the following maintenance 
commands:
test isdn-testcall grp#/mem# [minutes #]
This command initiates an outgoing ISDN-PRI test call up to 120 minutes. Default times are 
as above. Only one trunk per PN can be tested at one time.
status isdn-testcall grp#/mem#
This command displays the progress of the outgoing test call by reporting bit and block error 
rates of the tested B channel.
PI (TN765)
or
PACCON
(TN778)
NETCON SPE
D-channel Setup
B-channel
B-channel
TDM BUS
M/T
TN7771B
DS1/UDS1