Schneider Electric ACECFR20200SE Manual De Usuario

Descargar
Página de 32
EcoBreeze System Installation
8
Site Preparation
Incoming power supply requirements
N
OTE
: This equipment requires three-phase electrical service. Electrical service must conform 
to national and local electrical codes. The equipment must be grounded.
N
OTE
: To facilitate routing of main power supply wiring, run parallel wires for the main power 
connections.
Ductwork
Provide supply and return ducting at the site to connect to the supply and return ductwork on 
the EcoBreeze System. 
See the ductwork drawings in submittal package for recommendations for ducting 
sizes and supply and return duct configurations. 
Water supply
Supply water requirements. 
The water supply must be clean, potable water. The inlet water 
pressure provided to the unit must be between 207 and 448 kPa (30 and 65 psig). If the water 
pressure available is less than 207 kPa (30 psig), a booster pump (not supplied) may be 
needed to operate the equipment properly. If the water pressure available is higher than 448 
kPa (65 psig), use an external pressure regulator (not supplied).
NOTE: Installation of back flow prevention and a water hammer arrestor is recommended.
N
OTE
Foundation
Provide a foundation for the EcoBreeze System as recommended in the submittal package. 
Corner supports must have clamp connectors installed to secure the EcoBreeze Frame. See 
“Position the EcoBreeze” on page 14. Intermediate supports must have vibration damper pads 
installed on the top surface before the frame is placed on the permanent supports. 
See EcoBreeze Frame Install Kit installation instructions for additional information. 
NOTICE
DAMAGE TO EQUIPMENT
External water piping must have adequate freeze protection and must be correctly applied 
based on local climatic conditions and best practices. Any exposed piping must be 
electrically heat-traced and insulated (supplied by others). 
Failure to follow these instructions can result in equipment damage.