EcoBreeze System Installation
14
Mechanical Connections
Install the EcoBreeze Frame per the EcoBreeze Frame Install Kit instructions.
Position the EcoBreeze
N
OTE
: The power and plumbing connections for the EcoBreeze Frame are located on the end 
where the unpacking sheet is placed on the protective wrap. Typically this is the end that will 
face the building. 
1. Ensure that clamp connectors and vibration damper pads are installed per the 
EcoBreeze Frame Install Kit instructions.
2. Use a crane with sufficient lifting capacity to place the EcoBreeze onto the permanent 
supports. Typically the end of the frame with plumbing and power connections is placed 
nearest to the building. 
3. Using a 15/16-in. open-end wrench to turn the drive stud, lock down the clamp 
connectors located at each of the four corners. Maximum torque on the drive stud is 68 
N-m (50 ft/lb). 
na3561a