Schneider Electric ACECFR40201SE Manual De Usuario
![Schneider Electric](https://files.manualsbrain.com/attachments/984caf1d286e5e02d462a79fde1bf5fead2d9a5f/common/fit/150/50/91444bf287fb583af13341fc3281cd3c182bc046c845d04ce567acdbd94e/brand_logo.gif)
EcoBreeze System Installation
20
N
OTE
: Separate the drain line from the EcoBreeze Frame and the external drain line by a
50 mm (2 in.) air gap in order to prevent back up of contaminated water into the cooling system.
N
OTE
: Pitch the external drain piping at a minimum of 25 mm (1 in.) per 3048 mm (10 ft)
towards the wastewater drain.
na3564a
AIR GAP