Linear J-S Manual De Usuario

Descargar
Página de 26
NOTE:  It is now necessary to turn on the power in order to change the Operating Mode (if 
applicable), program any changes desired to the operator’s other settings, check for proper 
performance of all the operator’s features to include the brake (if applicable) and clutch 
(adjusting settings if necessary); and to finalize any adjustments to the limit settings.
  Before 
doing so, ensure that all mounting hardware are installed and properly tightened, that all electrical 
connections are per local code requirements, and that proper wiring practices have been followed.  
Also, double-check that all ropes have been removed from the door and that the doorway is 
clear.  
Figure 11 
PC
B
 1
1
2
6
9
5
 RE
V
 B 
TS
LK
OPE
N
C25
PB1
PB2
PB3
U5
STOP
CLOSE
OPEN
C1
R84
R2
R3
D12
COM
CL
OS
E
S
T
OP
NO R
E
V
NC
 R
E
V
PH
OT
O
 
MOTOR 
CONTROL 
BOARD 
Single 3 Button Station 
 
MOTOR 
CONTROL 
BOARD 
C
D
O
MC
B
 2
00
5
c.
p
. AL
LSTA
R CORP.
R8
R24
TB1
P5
R93
U5
R4
C21
D1
EXTERNAL INTERLOCK
PH
O
TO
COM
SI
NGL
E
IL
O
C
K
24 V
A
C
COM
Single Button and External Interlock Wiring 
Figure 13 
Note: When adding an External Interlock 
remove the factory installed jumper from 
the connection terminals. 
TURNING ON THE POWER TO THE OPERATOR  
RADIO
24V
R56
R55
R54
PC
B
 1
1
2
6
9
5
 RE
V
 B 
TS
LK
OPE
N
RM1
RM2
RM3
VCC
COM
P7
C25
R94
R87
R38
PB1
PB2
PB3
R5
R25
STOP
CLOSE
OPEN
C24
U1
D8
U4
C
11
R
30
R
26
R
29
C3
C1
C8
R95
R2
R3
D2
R65
C10
D3
C9
D12
R57
COM
CL
OS
E
S
T
OP
NO R
E
V
NC
 R
E
V
 
MOTOR 
CONTROL 
BOARD 
Multiple 3 Button Station 
Figure 12 
14 
3/SINGLE BUTTON STATION / INTERLOCK FIELD WIRING