Vanguard VE32LBH Manual De Usuario

Descargar
Página de 28
www.desatech.com
115121-01B
11
ACCESSORy 
INSTALLATION
Continued
7.  Remove blower/heater assembly with 4 
screws  from  packaging.  Blower  is  pre-
wired for convenience.
8.  Align blower assembly over hole pattern on 
blower mount and attach with 4 pan head 
screws provided (see Figures 22 and 23).
9.  With discharge pointing towards you, guide 
assembled  blower  mount  into  fireplace 
and center rear mounting flanges between 
standoff brackets at rear of the fireplace.
10. Lift blower mount up and position 4 locking 
tabs through notched openings in firebox 
top. Slide assembly forward until locked 
into position.
11. Remove control panel knockout plug lo-
cated in heater switch position by pressing 
locking tabs and pushing plug out through 
front of panel (see Figure 24).
12. Firmly insert red power switch into open 
mount  location  with  “ON”  (I)  indicator 
positioned on top.
13. Connect  white  heater  wire  to  neutral 
connection marked 'B' or 'A' on terminal 
block. See partial wiring diagram, Figure 
25, page 12.
Figure 21 - Disassembling Blower Mount
Control 
Panel
Control 
Cover
Blower 
Mount
Control 
Cover 
Screws
Hex 
Screws
Notches for 
Control Cover
Blower Mount 
Notch (1 of 4)
Screws
Figure 22 - Mounting Heater/Blower
Figure 23 - Mounting Alternate Heater/
Blower
Harness 
Strap
Heater/
Blower 
Assembly
Blower 
Mount
Mounting 
Screws
Mounting 
Screws
Heater/
Blower 
Assembly
Blower 
Mount
Figure 24 - Installing Heater Power Switch
Knockout Plug 
- Remove to 
Install Power 
Switch
Power 
Switch
14. Connect  black  heater  wire  to  terminal 
marked 'N-1' on heater power switch (see 
Figure  26,  page  12).  Note:  On  alternate 
style  heaters  white  and  black  wires  are 
connected common to terminal 'N-1' (see 
Figure 27, page 12).