Breckwell P24I Manual De Usuario

Descargar
Página de 32
B. 
WHEN VENT PIPE EXTENDS TO 
CHIMNEY TOP 
(Refer to Figure 15) 
 
1. 
You will need a pipe length equal to the 
chimney height (from hearth) plus 6 inches. If 
outside combustion air is to be used, you will 
need a pipe length (see “COMBUSTION AIR 
SUPPLY”
) equal to the chimney height plus 
12 inches. 
 
2. 
Attach cerablanket wrap to the end of vent 
pipe that will connect to the stove. Use 12-
inch lengths of light gauge metal wire (not 
included) or metallic tape (not included). This 
is to protect interior components from excess 
heat. 
 
3. 
Set the insert on the hearth and slide it in far 
enough to attach the vent pipe (and 
combustion pipe if used). 
 
4. 
Attach flashing (refer to Figure 14), route 
power cord out the side nearest a 120V 
receptacle. Slide in insert. 
 
5. 
Measure and build chimney top. Cut out hole 
for vent pipe (and combustion air intake pipe, 
if used). Install and seal with a non-
hardening mastic to prevent water leakage. 
Install the vent cap. 
 
C. 
WHEN VENT PIPE EXTENDS THROUGH 
CHIMNEY BLANKING PLATE  
                                                             
(Masonry Fireplaces Only) 
        (Refer to Figure 15) 
 
1. 
You will need a pipe length that extends 12” 
above the blanking plate. NOTE: This 
installation is optional but not recommended. 
Outside combustion air cannot be drawn 
from the chimney cavity in this installation. 
 
2. 
Attach cerablanket wrap to that end of vent 
pipe that will connect to the stove. Use 12-
inch lengths of light gauge metal wire (not 
included) or metallic tape. This is to protect 
interior components from excess heat. 
 
3. 
Measure and build blanking plate. Cut out 
hole for vent pipe (and combustion air intake 
pipe, if used). Install and carefully seal 
blanking plate with non-hardening mastic. 
Failure to properly seal may result in smoke 
spillage. 
 
4. 
Slide vent pipe (and intake pipe if used) up 
through the blanking plate hole, leaving 
enough to pull back down. 
 
5. 
Set the insert on the hearth, adjust the 
leveling bolts on the rear sides, and slide it in 
far enough to attach the vent pipe (and 
combustion air pipe if used). Be sure to seal 
where the pipe passes through the blanking 
plate. 
 
6. 
Attach flashing (refer to Figure 14), route 
power cord out the side nearest a 120V 
receptacle. Slide in insert. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
INSTALLATION 
12 
FIGURE 15