Roberts Gorden CTHN-125 Manual De Usuario

Descargar
Página de 48
SECTION 6: M
AJOR
 C
OMPONENTS
  
9
SECTION 6: MAJOR COMPONENTS 
FIGURE 11: Major Component Descriptions
Tube and Reflector Hanger 
with Clamp Package
Position this hanger no more 
than 4'' (10 cm) away from 
the burner assembly.
Coupling Assembly 
with Lock
Reflector End Cap
Punch out center section to 
accommodate tube.
Tube and Reflector Hanger
Suspend system from these 
hangers.
Flex Gas Line 
with Shut Off Cock
Burner Tube
Supplied in 10' (3 m) lengths. 
Burner tube is always the first 
tube after the burner.
Reflector Support 
Strap & Wire Form
Turbulator
Turbulator must be installed in the last standard section 
of tube.Turbulator is only required on the CTHN-40, 60 
and 80. For installation, See Page 21, Step 8.8.
EP-100 Pump Package -
For more information, refer to the 
EP-100 Installation, Operation and 
Service Manual
(P/N 127201NA).
EP-201 Pump Package - 
For more information, refer to 
the EP-200 Series Installation, 
Operation and Service Manual 
(P/N 127200NA).
Fan Assembly
EP-300 Series
Pump Package - 
For more information, 
refer to the EP-300 
Series Installation, 
Operation and 
Service Manual 
(P/N 127202NA).
Reflector (Aluminum or Stainless Steel)
Alternate overlap as shown on Page 15, 
Figure 14
 or on Page 18, Figure 17
Minimum overlap is 6'' (16 cm).
Tube
Hot rolled or heat treated aluminized 
tube supplied in 10' (3 m) lengths.
Burner with
Tube Gasket
Must be installed 
with the flame 
observation window 
facing down.
Restrictor Plate
Used at fan assembly inlet 
for unitary heaters only. 
See fan assembly below.