John Deere AC-115 Manual De Usuario

Descargar
Página de 84
Service
Operator’s Manual  
19
  WARNING:  TO  AVOID  RISK  OF  BURN  AND   
    ELECTRICAL  SHOCK,  NEVER  ATTEMPT   
    TO  SERVICE  SPACE  HEATER  WHILE  IT  IS   
    PLUGGED IN, OPERATING, OR HOT.
UPPER SHELL REMOVAL:
1. Remove screws along each side of space heater using 
5/16" nut-driver. These screws attach upper and lower 
shells together. (Fig. 4 or 5)
2. Lift upper shell off.
3. Remove fan guard.
FAN:
IMPORTANT:  Remove  fan  from  motor  shaft  before 
removing motor from space heater. The weight of the 
motor resting on the fan could damage the fan pitch. 
(Fig. 6)
1. Remove upper shell. (Fig. 4 or 5)
2. Use 1/8" allen wrench to loosen setscrew which holds 
fan to motor shaft.
3. Slip fan off motor shaft. 
4. Clean fan using a soft cloth moistened with kerosene 
or solvent.
5. Dry fan thoroughly.
6. Replace fan on motor shaft. Place fan hub flush with 
end of motor shaft. (Fig. 7)
7. Place setscrew on flat of shaft. Tighten setscrew firmly 
(40-50 inch-pounds / 4.5-5.6 n-m).
8. Replace fan guard and upper shell.
MAINTENANCE (CONTINUED):
 (Fig. 4)
 (Fig. 5)
Upper Shell
Fan Guard
Screw
Model: AC-70
Fan
Guard
Upper Shell
Screw
Models: AC-115 / 165
Motor Shaft
Setscrew
Fan
Motor
Shaft
Fan
Setscrew
Flush
Motor
 (Fig. 6)
 (Fig. 7)