ROOF CURB POST-INSTALLATION
CHECKS
After installation, check the top of the curb, duct connection
frame and duct flanges to make sure gasket has been ap-
plied properly.  Gasket should be firmly applied to the top of
the curb perimeter, duct flanges and any exposed duct con-
nection frame.  If gasket is loose, reapply using strong weather
resistant adhesive.
P
ROTRUSION
Inspect curb to ensure that none of the utility services (elec-
tric) routed through the curb protrude above the curb.
I
F
 
PROTRUSIONS
 
EXIST
DO
 
NO
 
ATTEMPT
 
TO
 
SET
 
UNIT
 
ON
 
CURB
.
CAUTION
ROOF TOP DUCT CONNECTIONS
Install all duct connections on the unit before placing the unit
on rooftop.
H
ORIZONTAL
 D
ISCHARGE
For horizontal discharge, remove the supply and return duct
covers and place them over the vertical discharge return and
supply openings. Install with insulation facing up, using the
longer screws provided in the literature package.
Ensure that the top of the duct connection frame is flush with
the top of the roof curb.
Flexible duct connectors between the unit and ducts are rec-
ommended.  Insulate and weatherproof all external ductwork
and joints as required and in accordance with local codes.
RETURN
SUPPLY
12”
17”
7 3/8”
11”
4 7/8””
25”
6 3/16”
REMOVE 
COVERS
HORIZONTAL DISCHARGE DUCT CONNECTIONS
RIGGING DETAILS
WARNING
T
O PREVENT PROPERTY DAMAGE, THE UNIT SHOULD REMAIN IN AN UPRIGHT
POSITION DURING ALL RIGGING AND MOVING OPERATIONS. 
T
O FACILITATE
LIFTING AND MOVING WHEN A CRANE IS USED, PLACE THE UNIT IN AN
ADEQUATE CABLE  SLING.
I
F
 
UNITS
 
ARE
 
LIFTED
 
TWO
 
AT
 
A
 
TIME
THE
 
FORK
 
HOLES
 
ON
 
THE
 
CONDENSER
 
END
 
OF
 
THE
 
UNIT
 
MUST
 
NOT
 
BE
 
USED
. M
INIMUM
 
FORK
 
LENGTH
 
IS
 42” 
TO
 
PREVENT
 
DAMAGE
 
TO
 
THE
 
UNIT
HOWEVER
, 48” 
IS
 
RECOMMENDED
.
CAUTION
Provisions for forks have been included in the unit base frame.
No other fork locations are approved.
WARNING
T
O PREVENT POSSIBLE EQUIPMENT DAMAGE, PROPERTY DAMAGE, PERSONAL
INJURY OR DEATH, THE FOLLOWING BULLET POINTS MUST BE OBSERVED
WHEN INSTALLING THE UNIT.
Unit must be lifted by the four lifting holes located at
the base frame corners.
Lifting cables should be attached to the unit with
shackles.
The distance between the crane hook and the top of
the unit must not be less than 60”.
Two spreader bars must span over the unit to prevent
damage to the cabinet by the lift cables.  Spreader
bars must be of sufficient length so that cables do not
come in contact with the unit during transport.
Remove wood struts mounted beneath unit base
frame before setting unit on roof curb.  These struts
are intended to protect unit base frame from fork lift
damage.  Removal is accomplished by extracting the
sheet metal retainers and pulling the struts through
the base of the unit.  Refer to rigging label on the unit.
Important: If using bottom discharge with roof curb, duct-
work should be attached to the curb prior to installing the
unit. Ductwork dimensions are shown in Roof Curb Installa-
tion Instructions.
Refer to the Roof Curb Installation Instructions for proper curb
installation. Curbing must be installed in compliance with the
National Roofing Contractors Association Manual.