Bard PA13421-B Manual De Usuario
Manual
2100-467
Page
10 of 23
24" min.
36" min.
24" min.
The distance between
1 inch clearance
Air Inlet
Air Inlet
Supply and Return Ducts
Building
Heater Package
Access
Control Panel
Access
Blower Service
Access
Blower
and
Blower Motor
Heater Package
Control Panel
Comp-
ressor
Nearest Structure
Nearest Structure
Nearest Structure
Condenser fan
and motor access
from top.
Leave 60" min.
above fan.
Side
View
Top
View
MIS-2143
between duct and
any combustible
material if distance
between outside
wall and unit is less
than 3 feet (needed
on electric heat
units only).
Supply Duct
Return Duct
outside wall and unit
varies with installation
requirements.
varies with installation
requirements.
Air Outlet
Mounting Slab
Ground Level
Package Unit
1/4 inch per foot
slope away
from building
slope away
from building
Compressor
Access
Building
FIGURE 2
SLAB MOUNTING AT GROUND LEVEL
FIGURE 3
AIRFLOW AND SERVICE ACCESS CLEARANCES