Bard WL602 Manual De Usuario

Descargar
Página de 20
Manual   2100-400
Page  10
FIGURE  5
WALL MOUNTING INSTRUCTIONS
FIGURE  6
WALL MOUNTING INSTRUCTIONS
MIS-1051
SEE FIGURE 3  – MOUNTING INSTRUCTIONS
SUPPLY AIR
      DUCT
RETURN AIR
   OPENING
RETURN AIR
   OPENING
SUPPLY AIR
  OPENING
BOTTOM MOUNTING
BRACKET.  MOUNT ON
WALL BEFORE
INSTALLING UNIT.
RETURN AIR
   OPENING
SUPPLY AIR
  OPENING
WALL STRUCTURE
FACTORY SUPPLIED RAIN
FLASHING. MOUNT ON UNIT
BEFORE INSTALLATION
SEE UNIT DIMENSIONS, FIGURE 1,
FOR ACTUAL DIMENSIONS
ATTACH TO TOP
PLATE OF WALL
1.000” CLEARANCE
ALL AROUND
1.000” CLEARANCE
ALL AROUND
EXTERIOR FINISHED
WALL OVER FRAME
ATTACH TO BOTTOM
PLATE OF WALL
FRAMING MATERIAL
2 X 4’S, 2 X 6’S AND/OR
STRUCTURAL STEEL
THIS STRUCTURAL MEMBER LOCATED TO MATCH
STUD SPACING FOR REST OF WALL.  A SECOND
MEMBER MAY BE REQUIRED FOR SOME WALLS.
RETURN DUCT
    OPENING
SUPPLY DUCT
     OPENING
MIS-948
INTERIOR FINISHED
WALL OVER FRAME