Honeywell S7999B Manual De Usuario

Descargar
Página de 68
S7999B, S7999C SOLA LOCAL OPERATOR INTERFACE
7
65-0303—05
Fig. 5. S7999B in a Building Automation System.
BAS Modbus message timeout should be set to 1.0 seconds or 
higher. This means it could take up to 1.0 seconds (max) for 
the System Display to reply to a BAS message.
Retries: BAS must setup retries upon timeout to ensure the 
Modbus request is accepted.
BAS Modbus poll rate should be set to 1.0 seconds. This 
means that the BAS should wait for a minimum of 1.0 seconds 
after receiving a Modbus message from Sola before sending a 
new Modbus message.
QUICK SETUP (S7999B OI 
DISPLAY)
1. Make sure the S7999B 9-pin connector is properly 
aligned and pressed firmly in place.
2. Make sure the wires between the 9-pin connector and 
the controller are properly wired and secure.
WARNING
Electrical Shock Hazard.
Can cause severe injury, death or equipment 
damage.
Line voltage is present at the 120 Vac power supply.
3. Make sure the power supply is connected securely to the 
120 Vac power source.
STARTING THE S7999B OI 
DISPLAY
Power-up Validation
The Home page will appear and the “Power” LED will be 
blinking when the device is properly powered. Select the 1234 
Setup button to adjust the contrast and sound as desired.
If the screen is dim, check the pin 1 and 2 wiring connections.
NOTE: An Advanced Startup screen displays for five seconds 
after power-up before the Home page displays. This 
screen allows the user to upgrade the software in the 
System Display (see “Preface” on page 2) and should 
normally be bypassed.
Three LEDs exist for I/O traffic: one for the Ethernet network 
port and two for Modbus™ ports. The ethernet port should only 
be used if instructed by Honeywell that an update is necessary. 
Modbus Com Port 2 is not active on this device.
1. Make sure the Power and COM1 LEDs are blinking.
2. If the LEDs are not blinking:
a. Make sure the proper connections have been made 
between the Modbus COM1 Port and the first control-
ler device in the Modbus network.
proper wiring of the OI Display 9-pin Header 
Connections.
3. If connected to a BAS application, COM2 LED will blink 
indicating BAS traffic.
Home Page (S7999B OI Display)
Make sure a screen similar to Fig. 6 appears after the OI 
Display has completely powered up.
On System applications, each SOLA Control is represented on 
the Home page by an icon and name. Pressing the icon allows 
the user to zoom in on that boiler and see its specific details. 
These details are provided on a new page, which can include 
additional buttons that display additional detail and operation 
information, which itself leads to other pages. The pages are 
traversed in a tree structure method, as shown in Fig. 8.
The Sola icons will appear in one of four colors indicating the 
boiler status.
• Blue: Normal operation
• Red: Lockout condition
• Gray: Standby mode (burner switch off)
M32006
UP TO 8
SOLAS
BAS
S7999B
COM 2
COM 1
S7999B
COM 2
COM 1
S7999B
COM 2
COM 1
EACH SOLA IN THE BAS WILL HAVE A DIFFERENT MODBUS ADDRESS.
1
1
SOLA
1
SOLA
2
SOLA
3
SOLA
4
SOLA
5