Installation & Operation Manual
5  
Hydronic piping 
(continued)
   
It is required that boiler piping systems 
utilize  Primary/Secondary or Fixed or 
Variable Flow Primary 
configurations as 
shown in FIG.’s 5-2 thru 5-5.  The use of 
other boiler piping configurations could 
result in improper building and system flow 
rates leading to inadvertent boiler high limit 
shutdowns and poor system performance.
 NOTICE
The pressure drop reflected in FIG. 5-1 is 
for the boiler only.  Additional allowances 
must be made for piping, especially if 
sizing pumps for Primary/Secondary 
applications.
 NOTICE
TEMPERATURE RISE APPLICATIONS
Model
BOILER 
CONNECTION SIZE
20°F 40°F
60°F
GPM
FT/HD
GPM
FT/HD
GPM
FT/HD
FB 1500
4"
138
3.4
69
1.5
46
1.0
FB 2000
4"
184
4.1
92
1.6
61
1.0
FB 2500
4"
230
4.6
115
1.3
77
0.7
FB 3000
4"
277
5.6
138
1.2
92
0.7
FB 3500
4"
323
7.5
161
1.2
108
0.7
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
0
50
100
150
200
250
300
350
FBN1500
FBN2000
FBN2500
FBN3000
FBN3500
Flow Rate (GPM)
P
ressu
re
 D
ro
p
 (F
eet
o
f H
e
ad
)
CREST Pressure Drop Curve
Figure 5-1  Pressure Drop vs. Flow 
Table 5A Sizing Information for Temperature Rise Applications_20°F, 40°F and 60°F
25
Circulator sizing
The Crest heat exchanger does have a pressure drop, which must be considered in your system design.  Refer to the graph in      
FIG. 5-1 for pressure drop through the Crest heat exchanger.
[Based on 92% AHRI Effi ciency]