6)    Permitted Terminals for Vertical Venting
 
• Vent Option 5 - A straight termination is installed in the end of the vent pipe. Vent manufacturer part numbers for these 
screens are shown in Table 7.5. The air inlet terminal consists of a 180 degree elbow (or two 90 degree elbows) with a 
rodent screen as shown in Figure 7.10. 
• Vent Option 6 - Use Crown PN 230532
 
with the appropriate flashing (Table 7.4b) 
7)    Vertical Vent Terminal Locations (Vent Options 5,6) - Observe the following limitations on the location of all vertical vent 
terminals (see Figures 7.10, 7.11):
• The top of the vent pipe must be at least 2 feet above any object located within 10 feet.
• For Vent Option #5, the vertical distance between top of the vent and air inlet terminal openings must be at least 12”.
• The bottom of the air inlet terminal must be at least 12” above the normal snow accumulation that can be expected on 
the roof. The terminal used in Vent Option #6 has a fixed distance above the storm collar of 19”. If a greater distance is 
needed to provide the clearance above the snow line, build a chase on the roof and mount the vertical terminal on top of 
the chase.   
• For Vent Option #5, the air intake terminal must be located on the roof and must be no further than 24” horizontally from 
the exhaust pipe.
 
8)    Wall thimbles – Wall thimbles are required where single wall vent pipe passes through combustible walls with less than 
the required clearance shown in Table 4.2 or as required by local codes. Stainless vent manufacturer’s wall thimble part 
numbers are shown in Table 7.5.   Note that concentric vent has a “zero” clearance to combustibles and therefore does not 
require the use of wall thimbles.
TABLE 7.5: PERMISSIBLE STAINLESS STEEL VENT SYSTEMS 
AND PRINCIPLE VENT COMPONENTS
 (VENT OPTIONS 2, 5)
MANUFACTURER
VENT 
SYSTEM
SIZE
COMPONENT PART 
NUMBER
HEAT FAB
SAF-T 
VENT
EZ SEAL
3
BOILER COLLAR
CROWN 230510 
3
WALL THIMBLE
HEAT FAB 7393, 7393GCS, 5391CI
3
HORIZONTAL TERMINAL 
CROWN 230511
3
VERTICAL TERMINAL
HEAT FAB 9392
PROTECH
 SYSTEMS
 INC.
FASNSEAL
3
BOILER COLLAR
CROWN 230510
3
WALL THIMBLE
FSWT3
3
HORIZONTAL TERMINAL
CROWN 230511
3
VERTICAL TERMINAL
FSBS3
Z-FLEX
SVE
SERIES III
(“Z-VENT 
III”)
3
BOILER COLLAR
CROWN 230510
3
WALL THIMBLE
2SVSWTEF03
3
HORIZONTAL TERMINAL
CROWN 230511
3
VERTICAL TERMINAL
24SVSTPF03
METAL-FAB
CORR/
GUARD
3
BOILER COLLAR
CROWN 230510
3
WALL THIMBLE
CGSWWPK(3”)
3
HORIZONTAL TERMINAL
CROWN 230511
3
VERTICAL TERMINAL
CGSWHTM(3”)
NOTES: 
1) See vent system manufacturer’s literature for other part numbers that are required such as straight pipe, elbows, firestops and vent supports.
2) Crown 230510 collar replaces factory-mounted concentric collar (Figure 7.16).   
  
16