Installation Instructions
PLP Series
8
TILT ADJUSTMENT
To tilt the display 0
°
 to 15
°
 down, do the following:
1. Manually tilt the display 0
°
 to 15
°
 down into the
desired position.
2. If desired, tighten the nut (see Figure 10) to increase
the amount of tension needed to hold the mount in
the position set in Step 1.
NOTE:Tighten the nuts only to adjust the amount of
tension needed to manually tilt and hold the
mount in place. Do not over-tighten the nuts.
Over-tightening the nuts may cause excessive
wear and may damage your mount.
3. Repeat Steps 1 and 2 until the desired tension is
obtained.
CABLE CONNECTION
To install or remove cables, do the following:
1. Manually tilt display down slightly (see Figure 10),
and then pull bottom of display out (see Figure 11).
2. Lower center support bar to keep the display tilted up
(see Figure 12).
3. Perform service. For example: Connect or disconnect
the power/audio/video cables.
NOTE:The service position is not recommended as a
final display position.
4. Raise the center support bar and reposition the
display to desired position (if necessary, refer to
“TILT ADJUSTMENT” procedure) after service is
completed.
WARNING: Watch for pinch points. Do not put your
fingers between moveable parts.
Figure 10. Tilt Display Down
Figure 11. Tilt Display Up (for service only)
Figure 12. Cable Connection
0
°
15
°
Center
support bar
Tilt the display
 0
°
 to 8
°
 to connect
or disconnect cables.
0
°
8
°
1. Tilt display down
(see Fig. 10)
2. Pull bottom out
(See Fig. 11)
3. Lower support bar.
4. Perform service.
5. Return display to
desired position.
1. Adjust pitch
2. If necessary, tighten
nut slightly to
increase tension.