Emerson IFT9701 Manual De Usuario

Descargar
Página de 90
Model IFT9701 Transmitter Instruction Manual
31
Flowmeter Startup
 continued
Co
nfig
uratio
n wit
Co
mm
u
n
ic
ato
r
T
ro
u
b
lesho
ot
ing
Con
fig
ur
atio
n
 w
ith
 Pr
oL
in
II
Flo
w
meter Star
tup
Figure 5-1
Location of LED, zero button, and LCD
5.5
Flowmeter zeroing
After the flowmeter has been fully installed, you must perform the zeroing procedure.
To perform the zeroing procedure using the flowmeter zero button, see the following 
instructions.
To use a HART Communicator for zeroing, see Chapter 6.
To use ProLink II software for zeroing, see Chapter 7.
5.5.1
Zeroing procedure
1. Prepare the flowmeter for zeroing:
a.
Install the flowmeter according to the instructions in this manual.
b.
Apply power to the meter, then allow it to warm up for at least 30 minutes.
c.
Run the process fluid to be measured through the flowmeter until the meter temperature 
approximates the normal process operating temperature.
d. Ensure that the sensor is completely filled with fluid.
2. Close the shutoff valve downstream from the meter.
CAUTION
Flow through the flowmeter during flowmeter zeroing 
will result in an inaccurate zero setting.
Make sure fluid flow through the flowmeter is completely 
stopped during flowmeter zeroing.
Area approvals tag
Field wiring compartment
With optional LCD
Sensor wiring compartment
Circuit board
compartment
User access not
normally required
Zero button
Diagnostic LED