Bradford-White Corp E32-80R Manual De Usuario

Descargar
Página de 12
Instructions for Conversion of Commercial Electric Models 
 
 
2
 
NOTICE 
The conversion procedure outlined in this manual is to be executed 
ONLY by Qualified Service Personnel.  Before attempting conversions 
it is recommended that you read the detailed instructions described 
herein. 
 
The purpose of this instruction manual is to instruct about the changing of wattage, voltage, and electrical 
phase for the commercial electric water heaters manufactured by Bradford White Corporation.  Underwriters 
Laboratories Inc. recognizes this procedure as herein presented and no deviation from these instructions 
are allowed.     
 
Special factory prepared “Conversion Kits” must be used for these conversions.  There are separate 
conversion kits that have individual instructions and MUST be followed.  Page 4 of these instructions lists 
the kits that have been prepared for the various wattages and voltages. 
 
These instructions do not allow for a modification that adds or deletes the number of heating elements 
originally supplied with the heater; therefore such a modification must NOT be attempted.   
 
These conversion kits are only applicable to Models E32-50S / E32-80R / E32-120R.  
 
        
The following information is provided to assist in the successful conversion of the water heater: 
 
Page 
 
 
 
 
 
 
Safety precautions .........................................................................3 
 
Introduction ....................................................................................3 
 
Required materials and tools .........................................................3 
 
Water heater preparation prior to conversion.................................3 
 
Conversion kits...............................................................................4 
 
Conversion of water heater K-W ....................................................5 
 
Conversion of water heater operating voltage ...............................6 
 
Conversion of water heater electrical power supply phase............7 
 
Recheck and inspection of the conversion results .........................8 
 
Concluding steps and reassembly after completion.......................9