Bradford-White Corp U2TW50T*FRN Manual De Usuario

Descargar
Página de 52
 Page 28 
Step 5. 
Disconnect yellow wires from the pres-
sure switch.
Step 6. 
Reconnect wires from step 5 to new pressure switch. 
Step 7. 
Reconnect tubing to new pressure switch. 
Step 8. 
Carefully position pressure switch into blower housing. 
Step 9. 
Position gas control power switch to the “ON” postion and verify 
proper heater operation. 
Step 10. 
Replace control access cover form step 2. 
Blower Testing
Step 1. 
Move the gas control power switch to the 
“ON” position and adjust control to call for heat. 
Step 2. 
Remove the three screws (Phillips screw 
driver) from the control access cover on  the blower as-
sembly and remove cover.   
Blower Testing 
Gas control power 
switch 
Yellow pressure 
switch wires 
WARNING
115 volt potential exposure. Use caution making voltage checks to avoid 
personal injury.
Control access 
cover
28