Chapter 7.0:  Electrical Detail 
 
7.1: 
Operation of the actuator is not dependant of the direction of motor rotation.  The cable leads can 
be connected to the U1, V1 and W1, (T1, T2, T3), terminals in any phase sequence. 
 
 
Figure 4 
Electrical Connections 
 
 
 
 
7.2: 
The motor leaves the factory already arranged for the specified voltage, which is also shown on 
the nameplate. 
 
7.3: 
If the motor was specified for a nominal 460 volts supply, it will be connected with nine terminals 
and the links arranged as shown in Fig. 4.  If at some future date the motor is required to operate 
from a 230 volts supply, re-arrangement of the links is required as shown. 
 
7.4: 
When specified for operation on 575 Volts or other single voltage, it will be connected with six 
terminals, the links arranged as shown in Fig. 4.  The winding will not be capable of re-connection 
for any other voltage. 
 
7.5: 
Explosion Proof actuators are only arranged for the terminal voltage shown on the nameplate.  
Three terminal posts will be visible when the cover plate is removed under the required 
conditions.  No provision is made for external re-connection to any other voltage. 
 
8/17/2006
 
Page 23 of 33 
MST/E Electric Shoe Brakes Manual 
  
560022-R6
 
7.6: 
A wiring diagram showing the possible terminal link arrangements is fastened inside the actuator 
terminal box cover.