Axor 10920001 Manual De Usuario

Descargar
Página de 8
3
Preparation
The Waterwall requires 1/2” NPT male nipples, extend-
ing 5/8” outside the surface of the finished wall for the 
hot and cold water supplies.  
For proper operation of the thermostatic mixer, the hot 
supply should be on the left and the cold supply should 
be on the right. 
Finish and seal the wall prior to installation of the 
Waterwall.
Flush the supply lines thoroughly before installation.
Installation
Drill the holes for the top and bottom mounting brack-
ets, using a 6 mm bit. Install the anchors. Seal around 
the anchors with waterproof sealant. 
Screw the mounting brackets to the wall with the screws 
provided.
Wrap the threads on the nipples with Teflon tape. Install 
the elbows so that the outlets face upwards. 
������
���
��
����
����
���
����
��
������
���
�����
����
Seal the wall around the nipples and 
anchors with waterproof sealant.
Failure to seal the wall can lead to 
possible water damage.