Lucent Technologies 8.2 Manual De Usuario
DEFINITY ECS Release 8.2
Administrator’s Guide
Administrator’s Guide
555-233-506
Issue 1
April 2000
References
1607
Basic DEFINITY ECS documents
21
DEFINITY ECS Release 8.2 — Installation for Adjuncts and Peripherals,
555-233-116, Issue 1
555-233-116, Issue 1
Provides procedures and information for hardware installation and initial testing
of ECS adjunct and peripheral systems and equipment.
of ECS adjunct and peripheral systems and equipment.
DEFINITY ECS Release 8.2 — Installation and Test for Compact Modular
Cabinets, 555-233-118, Issue 1
Cabinets, 555-233-118, Issue 1
Provides procedures and information for hardware installation and initial testing
of compact modular cabinets.
of compact modular cabinets.
DEFINITY ECS Release 8.2 — ATM Installation, Upgrades, and
Administration, 555-233-124, Issue 1
Administration, 555-233-124, Issue 1
Provides step-by-step instructions for how to install, upgrade, and administer
ATM switches.
ATM switches.
DEFINITY ECS Release 8.2 — Installation and Maintenance for Survivable
Remote EPN, 555-233-121, Issue 1
Remote EPN, 555-233-121, Issue 1
Describes how to install, cable, test, and perform maintenance on a Survivable
Remote Expansion Port Network (SREPN). Provides power, ground, and fiber
connections.
Remote Expansion Port Network (SREPN). Provides power, ground, and fiber
connections.
DEFINITY ECS Release 8.2 — Upgrades and Additions for R8.2r,
555-233-115, Issue 1
555-233-115, Issue 1
Provides procedures for an installation technician to upgrade an existing
DEFINITY Communications System or DEFINITY ECS to DEFINITY ECS
Release 8.2.
DEFINITY Communications System or DEFINITY ECS to DEFINITY ECS
Release 8.2.
Includes upgrade considerations, lists of required hardware, and step-by-step
upgrade procedures. Also includes procedures to add control carriers, switch node
carriers, port carriers, circuit packs, auxiliary cabinets, and other equipment.
upgrade procedures. Also includes procedures to add control carriers, switch node
carriers, port carriers, circuit packs, auxiliary cabinets, and other equipment.
DEFINITY ECS Release 8.2 — Upgrades and Additions for R8.2si,
555-233-122, Issue 1
555-233-122, Issue 1
Provides procedures for an installation technician to upgrade an existing
DEFINITY Communications System or DEFINITY ECS to DEFINITY ECS
Release 8.2.
DEFINITY Communications System or DEFINITY ECS to DEFINITY ECS
Release 8.2.
Includes upgrade considerations, lists of required hardware, and step-by-step
upgrade procedures. Also includes procedures to add control carriers, switch node
carriers, port carriers, circuit packs, auxiliary cabinets, and other equipment.
upgrade procedures. Also includes procedures to add control carriers, switch node
carriers, port carriers, circuit packs, auxiliary cabinets, and other equipment.