Cisco Systems 6807-XL Manual De Usuario

Descargar
Página de 118
Date
Time
Verified
By
Activity
Task No.
EMI evaluation
• Distance limitations for signaling
• Site wiring
• RFI levels
6
5 Verify that each power supply installed in the chassis has a dedicated AC source circuit.
6 Refer to the power supply'VA rating as a sizing criteria in determining the output required by the UPS. The power supply kVA rating value is listed in the
specifications table for each power supply in Appendix A (power supply specifications).
Cisco Catalyst 6807-XL Switch Hardware Installation Guide    
   OL-30656-01
27
Preparing for Installation
Site Preparation Checklist