TEST 31 - REMOVE WIRE 18 / SHUTdOWN 
LEAd
PROCEDURE:
1. Disconnect Wire 18 from the Stud located above the oil cooler
that extends out From the shrouding.
2. Perform Test 29 again checking for Spark.
RESULTS:
Refer back to Flow Chart.
WIRE 18
SHUTDOWN
LEAD
Figure 6-40. – Wire 18
TEST 32 - TEST START STOP RELAY (SSR)
PROCEDURE:
1. Set a voltmeter to measure DC voltage.
2. Remove Wire  15  from Terminal  13  on  the  Start  Stop  Relay
(SSR). Connect the positive meter test lead to Wire 15 previ-
ously removed. Connect the negative meter test lead to frame
ground. 12 VDC should be measured, if it is proceed to Step 3.
If 12 VDC is not measured repair or replace Wire 15 between
the SSR and the Battery Charge Rectifier 2 (BCR2).
3. With Wire 15 reconnected to the SSR remove Wire 229 from
the SSR. Connect a jumper lead from the terminal of the SSR
that Wire 229 was just removed from and to frame ground. See
Figure 6-43. The relay should energize closed, visually inspect
it  to  see  if  it  closes.  If  the  relay  energizes  closed  proceed  to
Step 4. If the relay does not energize closed replace it.
4. Remove Wire 0, Wire 18, Wire 15, Wire 15B, Wire 15, and Wire
14. See Figure 6-42.
5. Set  a  voltmeter  to  measure  resistance.  Remove  jumper  lead
from Step 3. Connect meter test leads across TEST POINTS
A  continuity/closed  should  be  measured.  Connect  meter  test
leads across TEST POINTS B INFINITY should be measured.
Connect meter test leads across TEST POINTS C. INFINITY
should be measured (See Figure 6-42). If the SSR fails any test
replace it.
6. Remove Wire  229  from  the  SSR.  Connect  a  jumper  lead
from the terminal of the SSR that Wire 229 was just removed
from  and  to  frame  ground. The  relay  should  energize  closed.
Set  a  voltmeter  to  measure  resistance.  Connect  meter  test
leads across TEST POINTS A INFINITY should be measured.
Connect meter test leads across TEST POINTS B continuity/
closed should be measured. Connect meter test leads across
TEST  POINTS  C  continuity/closed  should  be  measured.  See
Figure 6.43. If the SSR fails any test replace it.
RESULTS:
Refer to Flow Chart.
SSR
15B
14
13
9
10
12
5
1
2
6
4
8
229
0
18
14
15
15
15
Figure 6-41. – Start Stop Relay (SSR)
SSR
15B
14
13
9
10
12
5
1
2
6
4
8
229
0
18
14
TEST POINTS A
TEST POINTS B
TEST POINTS C
15
15
15
Figure 6-42. – Start Stop Relay (SSR) Not Energized