Cellboost 999-823 Manual De Usuario

Descargar
Página de 88
3-19
Pre-Start Inspection and Operation
10. When all trenching has been completed, raise the trencher boom out of the trench and move 
the trencher out of the way.
When the trenching has been completed, move the engine throttle to the idle position and allow 
the engine to cool off at idle for 3 - 4 minutes.
11. Lower the trencher boom to the ground.
12. Shut off the engine and clean the trencher chain, tracks, and operator's platform of dirt and 
mud.
NOTICE