Cisco Systems OL-7822-06 Manual De Usuario
1-3
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 1 Prepare for Installation
Workbench or Tabletop Installation
•
An adequate chassis ground (earth) connection exists for the SCE 1000 platform.
•
The SCE 1000 platform has at least 2 inches (5 cm) of clearance at each side and at least 5 inches
(12.7 cm) of clearance at the rear to allow proper air flow.
(12.7 cm) of clearance at the rear to allow proper air flow.
Step 1
Remove the adhesive strips from the four rubber feet and affix the feet onto the four marked locations
on the bottom panel of the unit.
on the bottom panel of the unit.
Step 2
Place the SCE 1000 platform on the tabletop or workbench.