Cisco Systems CSACS3415K9 Manual De Usuario

Descargar
Página de 678
C H A P T E R
15-1
User Guide for Cisco Secure Access Control System 5.4
OL-26225-01
15
Managing System Operations and Configuration 
in the Monitoring and Report Viewer
This chapter describes the tasks that you must perform to configure and administer the Monitoring and  
Report Viewer. The Monitoring Configuration drawer allows you to:
Manage data—The Monitoring and Report Viewer handles large volumes of data from ACS servers. 
Over a period of time, the performance and efficiency of the Monitoring and Report Viewer depends 
on how well you manage the data.
To do so efficiently, you must back up the data and transfer it to a remote repository on a periodic 
basis. You can automate this task by scheduling jobs to run periodically. See 
 for more information on data backup.
View log collections—The Monitoring and Report Viewer collects log and configuration data from 
ACS servers in your deployment, stores the data in the Monitoring and Report Viewer server, and 
processes it to generate reports and alarms. You can view the details of the logs collected from any 
of the servers in your deployment. See 
 for more information.
Recovering Log Messages—The Monitoring and Report Viewer recovers the logging entries that are 
missed during the log collection. The log messages are missed when the Monitoring and Report 
Viewer server is down or the connectivity between the Monitoring and Report Viewer and ACS 
server is broken. 
When connectivity is regained, the Monitoring and Report Viewer discovers the entries that were 
missed, and notifies the ACS server. When the ACS server receives this notification, it resends the 
entries to the Monitoring and Report Viewer. See 
 for more 
information.
View scheduled jobs—The Monitoring and Report Viewer allows you to schedule tasks that you 
must perform periodically. 
For example, you can schedule an incremental or full backup to be run at regular intervals. You can 
use the Scheduler to view the details of these tasks. See 
 fo
more information on the Scheduler.
View process status—You can view the status of the various processes that run in the Monitoring 
and Report Viewer. See 
 for more information on the various 
processes that run in the Monitoring and Report Viewer.
View data upgrade status—After you upgrade from ACS 5.3 to ACS 5.4 through the CLI, you must 
ensure that the Monitoring and Report Viewer data upgrade is complete. You can view the 
Monitoring and Report Viewer data upgrade status through the web interface and switch the 
Monitoring and Report Viewer database if upgrade is complete. See 
 for more information.