Cisco Systems 15454M6DC Manual De Usuario
5-19
Cisco ONS 15454 Installation and Operations Guide
November 2001
Chapter 5 SONET Topologies
Bidirectional Line Switched Rings
Step 2
Log into CTC and display the BLSR nodes in network view. Verify the following:
•
All BLSR spans on the network map are green.
•
On the Alarms tab, no critical or major alarms are present, nor any facility alarms, such as LOS,
LOF, AIS-L, SF, and SD. In a BLSR, these facility conditions may be reported as minor alarms.
LOF, AIS-L, SF, and SD. In a BLSR, these facility conditions may be reported as minor alarms.
•
On the Conditions tab, no ring switches are active.
If trouble is indicated, for example, a major alarm exists, resolve the problem before proceeding.
Step 3
Install the OC-N cards in the ONS 15454 that you will add to the BLSR; use the
. Ensure fiber cables are available to connect to the cards. Run test traffic
through the node to ensure the cards are functioning properly.
Step 4
Log into the new node and complete the BLSR setup.
•
Provision the SONET DCC using the
•
Configure the BLSR timing using the
.
•
•
Provision the BLSR using the
Step 5
example).
Step 6
Switch protection on the east port:
a.
Click the Maintenance > Ring tabs.
b.
From the East Switch list, choose FORCE RING. Click Apply.
Performing a FORCE switch generates a manual switch request on an equipment (MANUAL-REQ)
alarm. This is normal.
alarm. This is normal.
Caution
Traffic is unprotected during a protection switch.
Step 7
Log into the node that will connect to the new node through its west port (Node 1 in the
example).
Step 8
Switch protection on the west port:
a.
Click the Maintenance > Ring tabs.
b.
From the West Switch list, choose FORCE RING. Click Apply.
Step 9
Following the diagram that you created in Step 1, remove the fiber connections from the two nodes that
will connect directly to the new node.
will connect directly to the new node.
a.
Remove the east fiber from the node that will connect to the west port of the new node. In the
example, this is Node 4/Slot 12.
b.
Remove the west fiber from the node that will connect to the east port of the new node. In the
example, this is Node 1/Slot 5.
Step 10
Replace the removed fibers with fibers that are connected to the new node. Connect the west port to the
east port and the east port to the west port.
east port and the east port to the west port.
example after
the node is connected.