Cisco Systems 78-16356-01 Manual De Usuario

Descargar
Página de 92
Chapter 3      Installing the GSS
Unpacking and Inspecting the GSS
3-2
Cisco Global Site Selector 4491 Hardware Installation Guide
78-16356-01
Unpacking and Inspecting the GSS
The GSS shipment contains the following items:
One RJ-45 to female 25-pin sub-d connector
Two RJ-45 to female 9-pin sub-d connectors
One RJ-45 console cable
One four-post rack mount kit
One two-post rack mount kit
Four rubber feet
Cisco Product Documentation CD-ROM and Warranty Package
Cisco Global Site Selector 4491 Hardware Installation Guide
Regulatory Compliance and Safety Information for the Cisco Global Site 
Selector 4491 
The GSS is shipped in a protective shipping carton. It is shipped as a 
self-contained chassis; no components can be added or removed.
Follow these steps to unpack the GSS:
1.
Remove the GSS accessories from the shipping carton. Save the packing 
materials in case you need to repack the GSS later.
2.
Check the configuration of the GSS and the accessories against the items 
listed on the packing slip. Report any discrepancies as described in 
.
3.
Before installing the GSS, review the information outlined in 
If the Product is Damaged
If any portion of the unit or component is damaged in transit, forward an 
immediate request to the delivering carrier to perform an inspection of the product 
and to prepare a damage report. Save the container and all packing materials until 
the contents are verified.