Black Box JPM816A Prospecto

Descargar
Página de 2
BLACK BOX
®
 
 
FREE, live, 24/7 Tech Support is just 30 seconds away. 
724-746-5500   |   blackbox.com
© Copyright 2011. Black Box Corporation. All rights reserved. Printed in U.S.A. Black Box
®
 and the Double Diamond logo are registered trademarks of BB Technologies, Inc. Any third-party 
trademarks appearing in this manual are acknowledged to be the property of their respective owners.
JPM814A, version 2
Installation
Use the Feed-Through CAT6 Patch Panels with or without the cable management bar. It neatly organizes and supports the cables 
that are installed in rear of the patch panel.
Without using the cable management bar:
1. Find an empty rack space on a relay rack or communications cabinet.
2. Install the panel with the supplied 10-32 or 12-24 cuphead screws.
3. Install the RJ-45 patch cables on the front and rear connectors to make the connections.
Using the cable management bar:
1. Remove the two cuphead screws from each side of the patch panel.
2. Position the cable management bar on the patch panel and reinstall the two cuphead screws.
3.  Install a patch cable in one of the panel’s rear ports. Unscrew the corresponding silver clip behind the installed port and  
position the patch cable under the silver bracket. Tighten the screw.
4.  For a 48-port patch panel (JPM816A or JPM820A), repeat Steps 1 through 3 to install the second cable management bar.
Installation is complete.