Black Box BRTS-100 Manual De Usuario

Descargar
Página de 45
18
BRTS-100 ISDN TEST SET
13. a. If the terminal works, there’s no need to proceed any further.
b. If the terminal does not work, proceed to step 14.
14. Perform the PAIR REVERSAL test procedure (see page 22).
15. Put the circuit into its normal operating configuration.  (Connect all
terminals to the S/T interface.)
16. a. If the terminal works, there’s no need to proceed any further.
b. If the terminal does not work, proceed to step 17.
17. At this point, you’ve determined that there’s nothing wrong physically
with the S/T interface.  The problem is either within the terminal or
NT1—or possibly the ISDN network.  Perform the MONITOR test
procedure (see page 26).
Figure 4-4.  Comprehensive troubleshooting flow chart (2 of 2).
GOOD LINE,
DONE
TERMINAL
WORK?
NO
A
MONITOR
DONE
PB1 - CHECK
TERMINATIONS
YES
USING PASSIVE
BUS?
PB2 - PAIR
REVERSAL
TERMINAL
WORK?
GOOD LINE,
DONE
YES
NO
NO
YES