Cisco Systems 694 Manual De Usuario

Descargar
Página de 84
 
3-8
Cisco Wide Area Virtualization Engine 594 and 694 Hardware Installation Guide
OL-24619-02
Chapter 3      Installing the WAVE-594 and WAVE-694
  Connecting Power and Booting the System
Figure 3-6
Cable Connections—Front
Connecting Power and Booting the System
To connect power to your system, follow these steps:
Step 1
Review the information in the 
Step 2
Plug a power cord into the power cord receptacle on the back of the WAVE appliance. 
Step 3
Connect the other end of the power cord to a power source at your installation site. 
Step 4
Power up all externally connected devices.
Step 5
Press the power control button on the front of the WAVE appliance.
The system should begin booting. Once the operating system boots, you are ready to initialize the basic 
software configuration. (See the software configuration guide for details.)
Note
While the WAVE appliance is powering up, the green power-on LED on the front of the 
appliance is on.
Checking the LEDs
When the WAVE-594 and WAVE-694 is up and running, observe the front panel LEDs (see 
 
and 
) to verify that your system is operating properly. 
To troubleshoot using the LEDs, see 
1
Console port (mini-USB)
4
10/100/1000 GE 0/1 connector
2
Console port (RJ-45)
5
External USB port
3
10/100/1000 GE 0/0 connector
1
2
3
4
5
33
0060