Installing the NPE-G1 or NPE-G2
Installing the NPE-G1 or NPE-G2
To install the NPE-G1 or NPE-G2 in the router, use the following procedures:
  •
  •
 
  •
  •
  •
  •
 
  •
 
  •
  •
  •
Basic Guidelines
Note
If you have difficulty installing a network processing engine or I/O controller in the lowest slot of a Cisco 
7200 VXR router that is rack-mounted, remove the port adapters, network processing engine and I/O 
controller from the chassis and reinstall them. Install the network processing engine and I/O controller 
in the lowest slots first, then populate the slots above them, in a bottom-to-top order.
Use the following guidelines when installing the NPE-G1 or NPE-G2:
Step 1
Ensure that the router is powered down and the input power cable is disconnected from the router and 
the power source. See the 
.
Step 2
Attach an ESD-preventive wrist strap between you and an unfinished chassis surface.
Step 3
Remove the NPE-G1 or NPE-G2 from its static shielding bag.
Step 4
When touching the NPE-G1 or NPE-G2, use both hands, grasp the NPE-G1 or NPE-G2 by its metal 
carrier edges, and orient it so that its printed circuit board components face upward. 
Caution
Handle the NPE-G1 or NPE-G2 by the carrier edges and handle only; never touch the printed circuit 
board components or connector pins.