Toshiba XLTR-200 Manual De Usuario

Descargar
Página de 99
 
  
19
6.  Maintenance and Inspection 
Preventive maintenance and inspection is required to maintain the gateway in 
its optimal condition, and to ensure a long operational lifetime.  Depending on 
usage and operating conditions, perform a periodic inspection once every three 
to six months.  Before starting inspections, disconnect all power sources. 
 
Inspection Points 
• 
Check that the network cable(s) are properly terminated in the terminal 
block(s), and ensure that pluggable terminal blocks are fully seated in their 
headers.  Reseat if necessary. 
• 
Check that there are no defects in any attached wire terminal crimp points.  
Visually check that the crimp points are not damaged or loose. 
• 
Visually check all wiring and cables for damage.  Replace as necessary. 
• 
Clean off any accumulated dust and dirt. 
• 
If use of the gateway is discontinued for extended periods of time, apply 
power at least once every two years and confirm that the unit still functions 
properly. 
• 
Do not perform hi-pot tests on the gateway, as they may damage the unit. 
 
Please pay close attention to all periodic inspection points and maintain a good 
operating environment.