Nortel Networks R2MFC Manual De Usuario
38 Chapter 4 Installing the R2MFC MBM
NN40010-300
Reconnecting the equipment
After you install the module correctly into the bay, you must return the equipment to operation.
1 Plug the power cords for the BCM and any expansion units back into the AC outlets.
2 Connect the cables to the proper outlets on the R2MFC MBM and the MSC on the BCM.
3 Check that the LEDs on the newly installed R2MFC MBM are on and indicating the correct
state. Refer to
for a detailed description of the LED states.
4 Confirm that the BCM is functioning properly by testing to make sure it works the same as it
did before installing the R2MFC MBM.
5 Configure the module. Refer to
for
details.
Removing an R2MFC MBM
Follow the procedures in this section to remove an R2MFC MBM from a BCM platform base
chassis or expansion unit.
chassis or expansion unit.
provides an overview of the process for removing an R2MFC MBM.
Figure 10 Overview of removing an R2MFC MBM
Caution: Complete the following steps carefully to ensure you return your
system to operation without endangering the equipment or yourself.
system to operation without endangering the equipment or yourself.
Note: The Business Communications Manager system starts up when you
connect the AC power cord. System startup takes several minutes to complete.
connect the AC power cord. System startup takes several minutes to complete.
Shut down BCM and
expansion unit
Remove module cables
Remove module