Nortel Networks 703t Manual De Usuario
October 2006
Preinstallation requirements
703t Server Hardware Installation
37
Unpacking the 703t server
Introduction
Follow this procedure to unpack the server and peripherals.
To unpack the equipment
1 Carefully open the cardboard carton containing the server.
2 Remove the server from the carton and set it on the floor.
3 Carefully open the cartons containing the monitor, keyboard, mouse,
modem, and ELAN hub (if supplied), and set the peripherals aside.
4 Put all manuals, CD-ROMs, operating system disks, and any disks for
peripherals in a safe place.
.
WARNING
Risk of personal injury
The 703t CallPilot server weighs approximately 22 kg (46 lb)
as shipped from manufacturing. If necessary, and to prevent
personal injury, ask someone to help you unpack and position
the server.
as shipped from manufacturing. If necessary, and to prevent
personal injury, ask someone to help you unpack and position
the server.
ATTENTION
As you unpack each item, check it off against the
packing list, as well as against the following checklists
provided in the Installation and Configuration Task List
(555-7101-210):
packing list, as well as against the following checklists
provided in the Installation and Configuration Task List
(555-7101-210):
“CallPilot software media and documentation
checklist”
checklist”
“CallPilot server hardware checklist”