Cisco Systems EPC2420 Manual De Usuario

Descargar
Página de 138
 
Chapter 4    Operation of Front Panel Indicators 
 
 
 
96 
4021194 Rev A 
Initial Power Up, Calibration, and Registration (AC 
Power applied) 
The following chart illustrates the sequence of steps and the corresponding 
appearance of the residential gateway front panel LED status indicators during 
power up, calibration, and registration on the network when AC power is applied to 
the residential gateway. Use this chart to troubleshoot the power up, calibration, and 
registration process of your residential gateway. 
Note: After the residential gateway completes Step 7 (Data Network Registration 
Complete), the residential gateway proceeds immediately to Normal Operations. See 
Normal Operations (AC Power applied) (on page 98). 
 
Front Panel LED Status Indicators During Initial Power Up, Calibration, and 
Registration 
 
Part 1, High Speed Data Registration 
Step:  
Front Panel  
Indicator 
Self 
Test
 
Downstream 
Scan
 
Downstream 
Signal Lock
 
Ranging 
Requesting IP 
Address
 
Request High Speed 
Data Provisioning 
File
 
1  POWER 
On  
On 
On 
On 
On 
On 
2  DS 
On 
Blinking 
On 
On 
On 
On 
3  US 
On 
Off 
Off 
Blinking 
On 
On 
4  ON-LINE 
On 
Off 
Off 
Off  
Off 
Blinking 
5  PC* 
Off 
On or Blinking  On or Blinking  On or 
Blinking 
On or Blinking  On or Blinking 
6  WLAN* 
On 
On or Blinking  On or Blinking  On or 
Blinking 
On or Blinking  On or  
Blinking 
7  WLANSETU
Off 
Off or Blinking  Off or Blinking  Off or 
Blinking 
Off or Blinking  Off or  
Blinking 
8  LINE1 
On 
Off 
Off 
Off  
Off 
Off 
9  LINE2 
On 
Off 
Off 
Off  
Off 
Off 
*Notes: 
 
PC indicator displays only when a  PC device is connected to the Ethernet port on the gateway. 
 
WLAN indicator displays only when WLAN is turned on.