Cisco CRS-1 Carrier Routing System 4-Slot Line Card Chassis Installation Guide
OL-10971-07
Chapter 2      Installing and Removing Power Components
Installing a DC Power Shelf
Installing a DC Power Shelf
This section describes how install a DC power shelf in the Cisco CRS-1 4-slot line card chassis. For 
installations in which AC power is currently installed, this section also describes how to convert your 
Cisco CRS-1 4-slot line card chassis from AC power to DC power. 
The DC power shelf encloses four power supplies and the power distribution connections and wiring. 
The DC power input shelf is installed in the front of the chassis; the power input module (PIM) is 
installed in the rear of the chassis. 
We recommend that you have two separate, redundant -48  VDC  power battery sources to provide power 
to the Cisco CRS-1 4-slot line card chassis. Connect the two input pair 60-A DC inputs on the left to one 
-48 VDC power source, and the input pair 60-A DC inputs on the right to the other -48 VDC power 
source.
Sequence of Tasks
The sequence of tasks required to install the DC power shelf is as follows:
1.
Remove the rear power access panels.
2.
Install the DC power input module (PIM).
3.
Install the DC power input shelf.
4.
Mate and secure the power input module to the DC power input shelf.
5.
Connect the grounding cable and the power input cables.
6.
Install the DC power supplies.
11 AWG
1.257
12 AWG
1.5849
13 AWG
1.9987
14 AWG
2.5206
15 AWG
3.1778
16 AWG
4.0075
17 AWG
5.0526
18 AWG
6.3728
19 AWG
8.0351
20 AWG
10.1327
21 AWG
12.7782
22 AWG
16.1059
Table 2-3
Resistance for Each Gauge of Copper Wire (continued)
Wire Gauge (AWG)
Ohms for Each 1000 Feet of Wire