Cisco Systems OL-7396-01 Manual De Usuario

Descargar
Página de 934
7-86
ATM Switch Router Software Configuration Guide 
OL-7396-01
Chapter 7
Configuring Virtual Connections
Configuring VP Tunnels
Example
The following example shows the VP tunnel configuration on interface ATM 1/0/0 with PVP 99:
Switch# show atm interface atm 1/0/0.99
Interface:      ATM1/0/0.99     Port-type:      vp tunnel
IF Status:      UP              Admin Status:   up
Auto-config:    enabled         AutoCfgState:   waiting for response from peer
IF-Side:        Network         IF-type:        UNI
Uni-type:       Private         Uni-version:    V3.0
Max-VPI-bits:   0               Max-VCI-bits:   14
Max-VP:         0               Max-VC:         16383
ConfMaxSvpcVpi: 0               CurrMaxSvpcVpi: 0
ConfMaxSvccVpi: 0               CurrMaxSvccVpi: 0
ConfMinSvccVci: 35              CurrMinSvccVci: 35
Signalling:     Enabled
ATM Address for Soft VC: 47.0091.8100.0000.0060.3e64.fe01.4000.0c81.9000.63
Configured virtual links:
  PVCLs SoftVCLs   SVCLs   TVCLs Total-Cfgd Inst-Conns
      4        0       0       0          4          4
Configuring an End-Point PVC to a PVP Tunnel
To configure an end point of a permanent virtual channel (PVC) to a previously created PVP tunnel, 
perform the following steps, beginning in global configuration mode:
The following restrictions apply to an end point of a PVC-to-PVP tunnel subinterface:
The VPI number of the tunnel leg of any PVC connection must match the VP tunnel number of the 
tunnel.
For single service-category VP tunnels, the service class specified by the connection-traffic-table 
row (CTTR) of any PVC connections must match the service category for the row(s) selected for the 
tunnel PVP (for simple VP tunnels), or the configured service category (for shaped VP tunnels). 
This restriction does not apply to VP tunnels configured for multiple service categories (hierarchical 
VP tunnels).
For service classes other than UBR, the PCRs of all PVCs must be within the peak cell rate of the 
tunnel PVP. This setup requires new CTTR rows to be defined for CBR or VBR PVCs, with peak 
cell rates that are less than the intended tunnel PVP.
Example
The following example shows how to configure the example tunnel ATM 1/0/0.99 with a PVC from 
ATM interface 0/0/1 to the tunnel at ATM interface 1/0/0.99:
Switch(HB-1)(config)# interface atm 0/0/1
Switch(HB-1)(config-if)# atm pvc 0 50 interface atm 1/0/0.99 99 40
Command
Purpose
Step 1
Switch(config)# interface atm card/subcard/port
Switch(config-if)# 
Selects the physical interface to be configured.
Step 2
Switch(config-if)# atm pvc vpi-a vci-a [upc upc
[pd pd] [rx-cttr index] [tx-cttr indexinterface 
atm 
card/subcard/port.vpt# vpi-b vci-b [upc upc]
Configures the PVC with the VPI of the tunnel 
leg matching the tunnel VP tunnel number.