3com 4210G Manual De Usuario

Descargar
Página de 78
 
3-15 
Figure 3-21 
Connect an RPS power cord to the Switch 4210G PWR 24-Port and Switch 4210G PWR 
48-Port 
 
 
Step4 
Connect the other end of the RPS DC power cord to the external RPS power supply system. 
Step5 
Check whether the RPS LED on the front panel of the switch is ON. If the LED is ON, it shows the power 
cord is properly connected. 
Installing an Interface Module 
Each Switch 4210G 24-Port, Switch 4210G 48-Port, Switch 4210G PWR 24-Port, and Switch 4210G 
PWR 48-Port provides two interface module slots on the rear panel. For details about optional interface 
modules, refer to 
 on page 
The installation and removal of various interface modules are similar. This section describes the 
installation and removal of the Dual-Port 10 GE XFP Interface Module (3C17766) for illustration. 
Installing an Interface Card 
Step1 
Wear an ESD-preventive wrist strap, ensure a good skin contact and make sure that the 
ESD-preventive wrist strap is properly grounded. 
Step2 
Loosen the mounting screws of the filler panel on the interface module slot of the switch's rear panel 
with a Phillips screwdriver and remove the filler panel. 
Figure 3-22 
Install an interface module (1) 
 
 
Step3 
Hold the fastening screws on the front panel of the XFP interface module, and gently push the interface 
module in along the slot guide rail until the interface module is in close contact with the switch. 
Step4 
Tighten the captive screws with a Phillips screwdriver to fix the interface module.