Schneider Electric E4800 Manual De Usuario

Descargar
Página de 48
930-110-01-B.00 
PowerLogic
TM 
EM4800 Series
04/2011
Installation 
© 201
 Schneider Electric All Rights Reserved
7
INSTALLATION
This section contains the following installation topics:
Pre-Installation
The pre-installation checklist and site planning must be performed before 
installing the equipment at the site. 
Receiving
The equipment required for each PowerLogic EM4800 meter installation 
includes:
high-density meter (PowerLogic EM4833, PowerLogic EM4880 or 
PowerLogic EM4805)
For the PowerLogic EM4833 and PowerLogic EM4880, one 12-ft (4-m) 
AMP cable with one 50-pin connector supplied with each unit
For the PowerLogic EM4805, two Mate-n-Lok
TM
 wiring harnesses 
supplied with each unit in 8-, 12-, or 24-connector variants
CD and meter configuration software, this installation manual and an 
installation record form
When you receive your order, verify that the items listed above are included 
with the shipment, and visually inspect them for damage. If any parts are 
missing or damaged, contact your Schneider Electric representative.
Pre-Installation Checklist
The installer must provide the following information, tools, and equipment 
before proceeding with the installation:
certified current transformers for metering (not supplied)
an appropriate 15-Amp maximum circuit breaker or a fused disconnect 
switch for the type of panel
current/voltage meter to test the phasing of panels
RJ45 Ethernet patch cable
4-wire 14 AWG (1.63 mm
2
) cable for three-phase wye connected 
circuits, or 3-wire 14 AWG (1.63 mm
2
) cable for a single-phase wye 
connected circuits
small flat-head screwdriver
#2 Phillips screwdriver
crimping tool
18 AWG butt splice connector
wire strippers
four 1-inch (25 mm) #8 mounting screws suitable for selected mounting 
surface