Broadmore 1750 - Release 4.6
8-21
 
Maintenance and Troubleshooting
Failure Recovery
Failure Recovery
Failure recovery is the sequence of events necessary to bring the Broadmore 1750 back to 
fully operational status after an unexpected service interruption. Throughout the recovery 
process, specific problems should be corrected following the troubleshooting flowchart (see 
Figure 8-2). The steps in failure recovery are:
1. Ensure sufficient stable electrical power is available to both the Broadmore 1750 and 
the control station. Observe successful completion of POST.
2. Establish communications from the control station to the Broadmore 1750. Login and 
view alarm LEDs. Correct all hardware problems before proceeding.
3. The Broadmore 1750 will automatically load the configuration that was saved for 
power-up. PVC and originated SVC connections will be re-established to the ATM 
backbone. Far-end originated SVCs must be re-established from the far end. Alternate 
previous system configurations may be loaded if they were saved. This is 
accomplished following the sequence below.
4. Monitor activity for individual slots and for the ATM connection.
5. Verify configuration of the NIM(s). Validate parameter settings with the ATM switch 
if in doubt. Check the timing options and other parameters. Change as necessary to 
eliminate any errors.
6. Verify configuration of the installed SAMs. Monitor individual slots.
7. Monitor activity for the ATM connection. Select individually defined circuits to edit 
or connect and monitor the respective port.
Select System Management
 
Select Configuration Files
 
Select the saved file to restore